Porcelain Patios in Sheffield

Infascape lays porcelain patios across Sheffield and surrounding areas on a fully excavated, compacted sub-base with designed falls and drainage, bedded and jointed so slabs don't move or hold water.

Porcelain patio laid by Infascape in Sheffield

What's included

  • Levels set and falls designed so water runs away from the house
  • Excavation and waste removal
  • Compacted MOT Type 1 sub-base, laid in layers
  • Full mortar bed with slurry primer on the back of every slab
  • Precision cutting and jointing
  • Drainage channels or soakaway where needed

A typical 25–35m² patio takes 4–6 working days.

The difference between a £3k patio and a £6k patio

It's what's underneath. Cheap patios skip the sub-base and lay on dot-and-dab. That's why slabs rock, sink and hold puddles.

We excavate properly, compact in layers, fully bed and prime every slab, and design the falls. Puddles mean someone got the drainage wrong. We don't.

How we build it

  1. 1

    Design and quote

    We agree size, layout, slab choice and levels on site. Your written quote lists the build-up underneath, not just the slab price.

  2. 2

    Excavate

    Dig to the depth the build-up needs and remove the waste.

  3. 3

    Sub-base

    MOT Type 1 laid and compacted in layers, set to the falls.

  4. 4

    Lay

    Full bed, primed slabs, cut and set to line and level.

  5. 5

    Joint and finish

    Joints filled, edges finished, site cleaned and handed over.

What affects the cost?

No two jobs are the same, so we price every one from a site visit. You get a written quote that shows what is being built and how, not just a total. These are the things that change the price:

  • Slab choice (porcelain prices vary widely)
  • Number of cuts, curves and steps
  • Depth of dig and amount of waste
  • Drainage needed near the house

Recent porcelain patios work in Sheffield

Porcelain paving patio Sheffield
Close-up of porcelain paving joints Sheffield
Porcelain paving with brick wall Sheffield
Large porcelain paving area Sheffield

See more of our work

What customers say

“We had our garden completely renovated recently including all new fencing, gravel boards, plus new decking, porcelain tiling & turf by Rob & his team. We would highly recommend as they were professional, courteous & exceptional in their work. Due to an extension access and materials had to come through the house, they managed this as part of the project & kept any mess to a minimum. We are extremely happy with our new garden & would definitely use Infascape for any future projects, thank you.”

Kathryn Jackson

Full garden renovation: fencing, decking, porcelain and turf · Google review, August 2026

“I've used Infascape twice now. Last year for fencing and a new patio and this past week they have re-laid my lawn and created me a hard standing area for my bins. Rob understands exactly what you want and also gives you his advice. All the guys who i have dealt with at Infascape are professional, polite and hardworking. Both jobs have been done on time, to budget, to a fantastic standard and they leave the job clean and tidy. I would not hesitate to use them again or advise anyone else to use them.”

Claire Green

Fencing and patio, then a new lawn and bin hardstanding (repeat customer) · Google review, March 2026

Read all reviews

Porcelain Patios: common questions

How much does a porcelain patio cost in Sheffield?

It depends on size, the slab you choose, the depth of dig, cuts and steps, and drainage near the house. We price every patio from a site visit with a written quote that lists the build-up underneath. Most of our projects fall between £3,000 and £15,000+.

Why do some patio quotes come in much cheaper?

Usually because the sub-base is thin or missing, slabs are laid on dots of mortar rather than a full bed, or the falls aren't designed. Those patios look fine on day one and start rocking or holding water within a few years.

Is porcelain better than sandstone?

Porcelain is denser, more stain-resistant and needs less maintenance. It must be primed and fully bedded, because mortar doesn't grip it like natural stone. Sandstone is softer and needs sealing.

Will my patio drain properly?

Yes. We set a fall away from the house and add channel drains or a soakaway where the ground won't take the water.

How long does a patio take to lay?

Most 25–35m² patios take 4–6 working days, depending on access, cuts and weather.

Get a quote for your porcelain patios

Tell us what you're after and we'll come out, measure up and give you a written quote that shows exactly what's being built.