Tarmac Driveways in Sheffield
Infascape installs tarmac driveways across Sheffield and surrounding areas on a full 200mm compacted MOT Type 1 sub-base, with a binder course and a surface course laid to calculated tonnage.

What's included
- Site survey, levels and drainage plan before any digging
- Excavation and muck away by grab lorry
- 200mm MOT Type 1 sub-base, compacted in layers
- Edging (block or kerb) set on a concrete bed and haunched
- Binder course and surface course, tonnage calculated from the area
- Drainage falls to a permeable border, soakaway or channel
- Site left clean, waste removed
A typical 40–60m² driveway takes 3–5 working days, weather permitting.
Why cheap tarmac costs more
Most driveway failures are base failures. When the sub-base is thin or compacted once instead of in layers, the drive ruts and sinks within two years, and the only fix is to dig it all out again.
We calculate tonnage from the area and depth for every layer. That is why our price is what it is, and why our driveways are built to last 10+ years.
How we build it
- 1
Survey and quote
We measure the area, check levels, existing base and where surface water will go. You get a written quote that shows what is being built, not just a total.
- 2
Dig out and base
Old surface and soft ground removed. 200mm of MOT Type 1 laid and compacted in layers, not in one pass.
- 3
Edging
Edges set on concrete and haunched so the tarmac has something solid to finish against.
- 4
Surfacing
Binder course then surface course, rolled while at temperature. Quantities are calculated, not guessed.
- 5
Handover
We walk the job with you, explain aftercare and leave the site clean.
What affects the cost?
No two jobs are the same, so we price every one from a site visit. You get a written quote that shows what is being built and how, not just a total. These are the things that change the price:
- How much needs digging out and taking away
- Access for the grab lorry and plant
- Length of edging and any steps or levels
- Drainage needed to meet planning rules
What customers say
“Absolutely over the moon with the work done. Had my drive widened so had both sides dug out and then new drive with overlay of the old one. I couldn't have asked for better company to do it, from start to finish I knew what was happening and constantly kept in the loop of updates etc. absolutely bang on, I'd 100% be using these guys again for future works. Thank you”
Joe McArdle
Driveway widening and new surface · Google review, April 2026
“Rob & the lads transformed the front of our house, we had a new driveway, bespoke fencing & large double gate, they even painted all the brickwork for us. They went above & beyond in all aspects from the actual job, the extra bits & obviously the price! From the initial conversation with Rob, the punctuality of the guys & the expert workmanship, we couldn't be happier. I wouldn't hesitate to recommend these guys to anyone & we can't wait to have them back for the many other jobs we have that need doing. Great work fellas & thank you.”
Nick Dennis
New driveway, bespoke fencing and double gates · Google review, February 2026
Tarmac Driveways: common questions
How much does a tarmac driveway cost in Sheffield?
Every driveway is priced from a site visit, because size, access for the grab lorry, how much needs digging out and the drainage needed all change the cost. You get a written quote that shows what is being built, not just a total. Most of our projects fall between £3,000 and £15,000+.
How deep should a driveway sub-base be?
We lay 200mm of compacted MOT Type 1 on every new driveway. Thinner bases are the main reason driveways rut and sink within a couple of years.
Do I need planning permission for a tarmac driveway?
For a front garden over 5m², planning permission is usually needed if rainwater runs off onto the road. It is not needed if the water drains to a lawn, border or soakaway on your property. We design the falls and drainage so your driveway meets this.
How long does a tarmac driveway last?
A tarmac driveway built on a proper, well-compacted base should last 10+ years. One laid on a thin or poorly compacted base can fail in two or three.
When can I drive on my new tarmac driveway?
Usually after 24–48 hours for cars. Avoid sharp turns on the spot and heavy vehicles for the first few weeks while the surface hardens, especially in hot weather.
Get a quote for your tarmac driveways
Tell us what you're after and we'll come out, measure up and give you a written quote that shows exactly what's being built.