Composite Decking in Sheffield
Infascape builds composite decking across Sheffield and surrounding areas on a level, ventilated sub-frame set on solid foundations, including raised decks, decking borders and outdoor kitchen areas.

What's included
- Ground cleared and weed membrane laid
- Foundations for the sub-frame
- Treated sub-frame, level and spaced to the board maker's spec
- Ventilation gaps so the frame stays dry
- Composite boards, fascia and trims
A typical 15–25m² deck takes 3–5 working days.
Why composite decking still fails
Composite boards don't rot, but the frame underneath can. Decks bounce, sag and go out of level when joists are spaced too wide or the frame sits on soil.
We build the frame to the board maker's spacing, on solid foundations, with ventilation so it stays dry.
How we build it
- 1
Design and quote
We agree size, height, steps and board colour.
- 2
Groundwork
Ground cleared, membrane laid, foundations set.
- 3
Frame
Sub-frame built level, with joist spacing to the board maker's spec.
- 4
Boards
Boards fixed with hidden clips where specified, fascias and trims finished.
- 5
Handover
Walk-round, cleaning advice and site cleaned.
What affects the cost?
No two jobs are the same, so we price every one from a site visit. You get a written quote that shows what is being built and how, not just a total. These are the things that change the price:
- Board range and colour
- Height (raised decks need more frame and balustrade)
- Steps, curves and borders
- Ground conditions
What customers say
“We had our garden completely renovated recently including all new fencing, gravel boards, plus new decking, porcelain tiling & turf by Rob & his team. We would highly recommend as they were professional, courteous & exceptional in their work. Due to an extension access and materials had to come through the house, they managed this as part of the project & kept any mess to a minimum. We are extremely happy with our new garden & would definitely use Infascape for any future projects, thank you.”
Kathryn Jackson
Full garden renovation: fencing, decking, porcelain and turf · Google review, August 2026
“I couldn't be happier with Rob and his team, from the first consultation in September 2025, we have had them back 3 times to complete our full garden. Rob and all his team were professional, knowledgeable and very friendly. The attention to detail was outstanding and I was very happy with the results. They stayed on schedule, kept the work area clean and well communicated throughout all the 3 projects. I would highly recommend them as they exceeded our expectations.”
Nicola Spencer
Full garden over three projects: paving, fencing, artificial grass and decking · Google review, February 2026
Composite Decking: common questions
How much does composite decking cost in Sheffield?
It depends on size, height, the board range, steps and borders, and ground conditions. Raised decks need more frame and balustrading. We price every deck from a site visit with a written quote.
Is composite decking better than timber?
Composite won't rot, splinter or need staining, and keeps its colour longer. It costs more up front, but needs far less maintenance.
Does composite decking get slippery?
Good composite boards have a textured, grip-rated surface. Keeping the deck clean of moss and leaves keeps it safe in wet weather.
How long does composite decking last?
The boards typically last 20+ years. The life of the deck depends on the sub-frame, which is why we build the frame properly.
Can you build an outdoor kitchen area?
Yes. We build decking and paving areas for outdoor kitchens and seating as part of wider garden projects.
Get a quote for your composite decking
Tell us what you're after and we'll come out, measure up and give you a written quote that shows exactly what's being built.